DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系
国产高清亚洲精品视bt天堂频,中文字幕av免费专区,东京av在线无码,久热精品在线中文字幕播放